項(xiàng)目展示Project Display
模擬制動(dòng)試驗(yàn)臺(tái)
Simulated brake test bench
制動(dòng)系統(tǒng)測試臺(tái)用于制動(dòng)系統(tǒng)的單個(gè)零件和連接質(zhì)量驗(yàn)證。該制動(dòng)系統(tǒng)測試臺(tái)可以模擬現(xiàn)實(shí)條件下的制動(dòng)系統(tǒng),并且更易于更換部件,監(jiān)控制動(dòng)系統(tǒng)的性能要比在實(shí)際車輛中要好。
The brake system test bench is used for the brake system single part and connection quality validation. The brake system test bench enable simulating the brake system working in the reality condition, and easier to replace the components, monitor the brake system performance than in the real vehicle.
充電樁改造項(xiàng)目
Charging pile renovation project
將研發(fā)停車場當(dāng)前使用的電動(dòng)汽車充電支柱更換為新的充電支柱(由供應(yīng)商設(shè)計(jì)并經(jīng)BBT-E-60 確認(rèn)),并適用于 B 型 RCD 和斷路器的直接安裝。此新支柱必須適用安裝一個(gè)和兩個(gè)電動(dòng)汽車充電墻盒。
Exchange of the current used EV(Electric Vehicle)-Charging pillars in the R&D parking lots to new charging pillars (designed by the supplier and confirmed by BBT-E-60), which are suitable for the direct installation of type B RCDs and circuit breakers together. This new pillar must be suitable for the mounting of one and also two EV-Wallboxes.
BBT-E-51直流充電樁項(xiàng)目
BBT-E-51 DC charging pile project
本項(xiàng)目投資用來購買能覆蓋國內(nèi)及出口市場相應(yīng)標(biāo)準(zhǔn)的大功率充電設(shè)施,用來確保所有G08BEV車輛的充電需求。
Investment needed for high power charging facility to cover local and export market charging and to guarantee all G08BEVs daily charging.
汽車生產(chǎn)線安裝項(xiàng)目
BIW Euipment Installation project
項(xiàng)目:偉巴斯特C346 生產(chǎn)線
時(shí)間:2016年01月-12月
項(xiàng)目描述 / Project Description:
項(xiàng)目包含,所有的夾具及傳輸設(shè)備的設(shè)計(jì)及制作。電氣部分的整體設(shè)計(jì)與調(diào)試。
Date:01-12 ,2016
Project: C346 production line
The project includes the design and manufacture of all fixtures and transmission equipment. The overall design and commissioning of the electrical part.
汽車生產(chǎn)線安裝項(xiàng)目
BIW Euipment Installation project
項(xiàng)目:米其林輪胎生產(chǎn)線
時(shí)間:2017年01月-12月
項(xiàng)目描述:項(xiàng)目包含,所有的夾具及傳輸設(shè)備的組裝調(diào)試。
Project:Michelin tire production line
Date:01-12,2017
Project Description: Theproject includes the assembly and commissioning of all fixtures andtransmission equipment.
汽車生產(chǎn)線安裝項(xiàng)目
BIW Euipment Installation project
項(xiàng)目:寶馬發(fā)動(dòng)機(jī)維修工位缸蓋下線工裝
時(shí)間:2016年09月-12月
項(xiàng)目描述:此項(xiàng)目包含機(jī)械結(jié)構(gòu)設(shè)計(jì)及制作。
Project:BMW engine repair station cylinder head off-line tooling
Date:09-12,2016
Project Description: This project includes mechanical structure design and production.
真空設(shè)備改造項(xiàng)目
Vacuum equipment renovation project
時(shí)間:2015年09月-12月
項(xiàng)目描述:2015年09月起,我公司承接了沈陽恒進(jìn)真空設(shè)備有限公司一臺(tái)真空設(shè)備結(jié)構(gòu)及外觀改造。
Date:09-12,2015
Project Description: Since September 2015, our company has undertaken a vacuum equipment structure and
appearance modification of Shenyang Hengjin Vacuum Equipment Co., Ltd.
德科(沈陽)斯米爾吸附模具脫模劑設(shè)備項(xiàng)目
DR?XLMAIER Adsorption Mold Release Agent Equipment Project
時(shí)間:2017年10月-2018年2月
項(xiàng)目描述:項(xiàng)目包含,所有的夾具及傳輸設(shè)備的設(shè)計(jì)及制作。電氣部分的整體設(shè)計(jì)與調(diào)試。
Date:10.2017-02.2018
Project Description: The project includes the design and manufacture of all fixtures and transmission
equipment. The overall design and commissioning of the electrical part.
華晨寶馬組裝車間–前臉裝配工裝國產(chǎn)化
BMW Brilliance Assembly Workshop – Localization of front face assembly tooling
時(shí)間:2016年3月-12月
項(xiàng)目描述:2016年3月起,我公司承接華晨寶馬組裝車間
–前臉裝配工裝國產(chǎn)化。
項(xiàng)目包含夾具的制作、安裝調(diào)試。
Date:03-12,2016
Project Description: Since March 2016, our company has undertaken the localization of front face assembly tooling for the BMW Brilliance assembly workshop.
The project includes the production, installation and commissioning of the fixture.